Forum quick links
Control types in Group Multi-occupant Spaces
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Jenny Carney on
All, Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces.
Existing Finish
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Sara Neff on
I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has existing
O&M Manual is the bible
posted by Bazeeth Ahamed Khader Mohamed Ali on
I have taken the exam in Feb 2011 and passed with 187. There are no short cuts. Get familize with the reference manual. Practice questions from GBES or Ever Blue may help you more
Private lavatory faucet
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sundararaj Subburaman on
Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products.
rating system and credit
posted by Tristan Roberts on
Hi Christopher, can you ground this discussion in a specific LEED rating system and credit? I am not sure if there is a Homes vs.
Too much Window Area (WA)?
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Rebecca Griffith on
Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area?