Fully opacified spandrel glazing

Pilot-Credits SSpc55:Bird collision deterrence
posted by  darryl strouse  on 

We are spandrelizing a significant portion of our project's glazing.

3
Thu Feb 9, 2023, 5:15 am

Waste Hauler

NC-v4 MRc5:Construction and demolition waste management
posted by  Stacey Schmidt  on 

I work for a waste hauler and am trying to figure out if there is any certification that we need in order to help LEED builders.

2
Wed Feb 8, 2023, 6:15 pm

Detailed requirements for Option 1, Path (2)b-2: Life-Skills Training for Social equity within the PROJECT TEAM

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Amie Blankenship  on 

Regarding 'Social equity within the project team' (NOT WITHIN O+M STAFF) Option 1, Path (2)b-2: Participation in, or providing of, access to workforce development training through Life-Skills train

0
2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Feb 8, 2023, 12:05 pm

Regarding Energy Simulation

Data-Centers-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Nagaraj Sankar  on 

One of our data center projects has an electrical room. This electrical room didn't have regular occupants.  In this case, do we need to provide fresh air for that space? 

1
Sun Feb 12, 2023, 2:02 pm

Regarding Energy Simulation

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Nagaraj Sankar  on 

One of our data center projects has an electrical room. This electrical room didn't have regular occupants.  In this case, do we need to provide fresh air for that space? 

0

Regarding Energy Simulation

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Nagaraj Sankar  on 

One of our data center projects has an electrical room. This electrical room didn't have regular occupants.  In this case, do we need to provide fresh air for that space? 

1
Mon Feb 13, 2023, 12:48 pm

BeCx - Ongoing commissioning plan

NC-v4.1 EAc1:Enhanced Commissioning
posted by  Manuelle Croft  on 

The commissioning authority must complete Enhance Cx tasks for the building(s)'s thermal envelope. An ongoing commissioning plan must be developped. 

0

Scope of ASHRAE 90.1:2010 section 9, in what regards to existing external lighting

NC-v4 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

In the context of a refurbishment, are the existing luminaires exempt from complying with the exterior lighting power and/or exterior lighting control requirements stated in ASHRAE 90.1:2010 sectio