design phase review appeal
posted by Todd LaFreniere on
Our project is currently at the Construction Final Review Stage and we would like to submit an appeal on 2 of our Design credits. How is this done?
Failed LEED ND Stage 1 Prerequisite
posted by Bernard Sagaiyaraj on
I have received my LEED ND Stage 1 review results which contained 2 failed prerequisites. Can I proceed to Stage 2 and correct them there?
Which Parking Areas to Include?
NC-2009 PIf2:Project Summary Detailsposted by Kevin Flynn on
I am beginning work on a fairly complex project. The portion of the project seeking LEED certification is an office building attached to an existing building.
CS and CI fee relationship
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
I have a project where we are doing a CS certification for the building owner and a CI project for the main tenant at the same time. I was about to submit both for Preliminary Certification.
Certifying one LEED building on a campus
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa Sawin on
We have currently drawn our LEED boundary to include all areas that our building/scope of work is impacting.
Data Centers - Efficiency for UPS and computer servers for the
NC-2009 EAp2:Minimum Energy Performanceposted by Carlos Garcia on
Dear all We're working in the energetic simulation for the credit EA p 2 in LEED NC 2009 in a Data Center building.
Natural Ventilation: Which spaces are to be considered?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marco Abdallah on
1. Are only regularly occupied spaces to be considered or all generally spaces (including stairs, corridors, storage and technical rooms)? 2.
Thermal Comfort (IEQc 7.1) for Industrial Applications
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ismaiel Salama on
We are targeting this credit for a project with more than 70% of the buildings are utilised for industrial, processing, storage and manufacturing activities.
LEED v2.2 design credit re-evaluation during construction submit
posted by Susan Walter on
We are wrapping up a LEED v2.2. project and looking to submit for our construction review. The design credits have been through the process and the design review has been accepted.