We are working on a project that has three different buildings on a previously developed site, for which we want to submit a Group Certification; it is mentionned in the associated guide that the 'whole site' needs to be considered as previously developed, but it doesn't show how the criteria needs to be applied. The 1/2 mile radius is usually from the main building entrance, but where should it start from when there are 3 buildings? Thanks a lot.