When to Use the AGMBC and is it required?

LEED Guidance for Campuses and Multiple Buildings
posted by  Nicole Ferrini  on 

I am working on a project that consists of 4 buildings. 2 of them are targeting certification and 2 of them are not (due to the fact that they would not meet MPRs).

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Tue Aug 21, 2012, 3:27 pm

LEED ND Exam

posted by  Tamera P  on 
4
Default Avatar
Urban Designer
Urban Strategies
LEEDuser Basic Member
5 thumbs up
Mon Aug 20, 2012, 2:41 pm

EAp1 Fundamental commissioning domestic hot water question

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Andrew Cooper  on 

Hello, I have a project in which I commissioned and the review comments came back that I did not include the kitchen sinks in my scope of work for the domestic hot water systems?

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Mon Aug 20, 2012, 12:11 pm

Air recirculation and outdoor air

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I have some doubts concerning air loops of the baseline model, system 5 (Packaged VAV with Reheat). Paragraph G3.1.3.13 “VAV Flow Minimum Flow Setpoints” states: “Minimum volume setpoints for VAV r

5
Fri Aug 17, 2012, 6:42 pm

Non-Densely Occupied Space Ventilation

Schools-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ara Massey  on 

The form for IEQc1 asks you to fill out table IEQc1-1 for all mechanical ventilation systems where 20% or more of the design supply airflow serves non-densely occupied spaces.

3
Default Avatar
Principal
New England Engineering, Inc.
LEEDuser Basic Member
2 thumbs up
Fri Aug 17, 2012, 5:51 pm
3
Thu Aug 16, 2012, 7:39 pm

Ready Mixed Mortar

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Maya Karkour  on 

Dear all, Does "ready mixed mortar" need to comply with the maximum VOC requirements of this credit?

3
Wed Aug 15, 2012, 7:33 pm

Thanks Andrew!

General forums
posted by  Samantha Harrell  on 

Thanks Andrew!

3
Wed Aug 15, 2012, 6:57 pm

ASHRAE 62.1 Item 5.9 - Minimum filtration required

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Carolina Vergnano  on 

Is it required to meet the filtration requirement of ASHRAE 62.1-2007, item 5.9 for equipment areas with no occupation?

2
Wed Aug 15, 2012, 6:16 pm

Baseline System for Warehouse Shell

CS-2009 EAp2:Minimum Energy Performance
posted by  Tony Schafer  on 

Wondering how to determine the baseline system for a warehouse that upon initial completion will be a cold, dark shell maintained at 50°F.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Aug 15, 2012, 5:31 pm