Topic | Recent |
---|---|
Paving as part of Construction CostsNC-2009 MRc4: Recycled Contentposted by Mariah Grife on Nov 29, 2012, 11:55 am
The new LEED language has clarified that 32.10.00 Paving should be included in the construction costs. However, the only paving that will occur on my project's contract will be in-street... Last reply: Nadav Malin, Nov 29, 2012, 10:23 pm |
|
Form v03 vs v04NC-2009 MRc4: Recycled Contentposted by Angie Allen on Nov 28, 2012, 12:19 pm
I am completing the documentation for MRc 4, 5 & 7. Currently, we are working from version 3.0 of the form on LEED Online. There doesn't appear to be an option to upload the Materials... Last reply: Michelle Rosenberger, Nov 28, 2012, 12:25 pm |
|
Using the LEED User "LEED Materials Calculator" for uploadingNC-2009 MRc4: Recycled Contentposted by Nelina Loiselle on Jun 27, 2012, 11:51 am
Has anyone acutally used LEED User "LEED Materials Calculator" for uploading to leedonline for MR credits 4-7 in lieu of transferring the data to the BDC Material Rescourse Calculator? Last reply: Julie Blue, Nov 28, 2012, 10:52 am |
|
Excluding Soil Brought in from Off-siteNC-2009 MRc4: Recycled Contentposted by Margaret McColl on Oct 12, 2012, 11:36 am
Hello, I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site. The... Last reply: Tim Crowley, Nov 27, 2012, 8:34 am |
|
Division 12 in MR creditsNC-2009 MRc4: Recycled Contentposted by Joseph Ford, AIA on Nov 20, 2012, 6:45 pm
I am wrestling with what this part of the MR credit overview says: "A project team may include materials costs from CSI MasterFormat Division 12 - Furniture and Furnishings as long as... Last reply: Hernando Miranda, Nov 20, 2012, 7:12 pm |
|
Home ScrapNC-2009 MRc4: Recycled Contentposted by Stantec IP - Dupe - Do not use on Nov 14, 2012, 11:41 am
I have a letter from a supplier claiming 58%... Last reply: Nadav Malin, Nov 17, 2012, 8:51 am |
|
very confused with Beta form for MR...NC-2009 MRc4: Recycled Contentposted by Carrie Laurendine on Oct 8, 2012, 4:07 pm
Im confused on many fronts. 1) taking over LEED documentation for someone who recently left, and I know little about the project - or LEED v3 online. 2) MR form that comes up for MR c 3-7 is a... Last reply: Caroline O'Leary, Oct 31, 2012, 1:22 pm |
|
Recycled Content of Steel from Multiple SuppliersNC-2009 MRc4: Recycled Contentposted by Jerry Reeves on Oct 24, 2012, 11:25 am
This is directly from the preliminary review report: 1. Bull Moose Tubing has been reported with a... Last reply: Hernando Miranda, Oct 24, 2012, 1:21 pm |
|
Materials Which Always Get Review CommentsNC-2009 MRc4: Recycled Contentposted by Hernando Miranda on Oct 22, 2012, 11:54 am
It is obvious that the LEED reviewers use a set of predetermined comments for certain material claims made. Nothing in the rating system documents states you have to defend a claim but certain... |
|
basecourse,bedding sand and subbase materialsNC-2009 MRc4: Recycled Contentposted by Benjie Herrera on Oct 16, 2012, 2:23 am
Are these materials-basecourse,bedding sand and subbase materials have... |