Forum » NC-2009 MRc3
Topic

Remanufactured Materials/Regional

NC-2009 MRc3: Materials Reuse
posted by Farah A. on Feb 16, 2014, 6:16 pm

-Does a re-manufactured product count in Materials Reuse? I know that Materials Reuse applies to products that are no longer used for their original intent- if a product is remanufactured into a...

Last reply: Tristan Roberts, Feb 24, 2014, 7:27 am

Calculating materials costs to achieve MR credits

NC-2009 MRc3: Materials Reuse
posted by Remigio Antonio Rancan on Oct 27, 2013, 5:08 am

Hi all,
i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me?
Thanks a lot.

Last reply: Tristan Roberts, Oct 27, 2013, 1:00 pm

Re-using shale and theater seating

NC-2009 MRc3: Materials Reuse
posted by Michelle Meis on Oct 3, 2013, 4:36 pm

I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process. They will be doing this by...

Last reply: Tristan Roberts, Oct 3, 2013, 9:21 pm

Material reuse based on cost or volume

NC-2009 MRc3: Materials Reuse
posted by Mahbuba Khan AIA, LEED AP BD+C on May 16, 2013, 12:30 am

I am working on an international LEED NC 2009 project. They are reusing some things at the site like, making bricks chips out of reused brick for low psi concrete, grinding excess concrete pears...

Last reply: Tristan Roberts, Jul 12, 2013, 3:30 pm

Material Reuse on Other Buildings within Site Boundary

NC-2009 MRc3: Materials Reuse
posted by Josh Sawyer on Apr 15, 2013, 2:03 am

We are working on project that has four buildings connected together on the site. One of the buildings is being demolished, and a new building built in its place, and many of the materials are...

Last reply: Tristan Roberts, Apr 15, 2013, 9:53 am

Trees on site to be used for furniture, blocking and/or veneer.

NC-2009 MRc3: Materials Reuse
posted by Seonhee Kim on Jul 20, 2012, 3:20 pm

If some of trees on site need to be cleared and we decide to use it for furniture, blocking and/or veneer, does this count as MRc3?

Last reply: Tristan Roberts, Mar 20, 2013, 7:15 pm

Dismantling of building

NC-2009 MRc3: Materials Reuse
posted by Tanja Arnesson on Feb 5, 2013, 6:02 am

Hi,
We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction....

Last reply: Tristan Roberts, Feb 7, 2013, 2:04 pm

Salvaged granite block

NC-2009 MRc3: Materials Reuse
posted by Sara Sweeney on Jun 9, 2012, 6:18 pm

Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built. It was re-purposed to a granite walkway on the site,...

Last reply: Susie Spivey-Tilson, Jun 11, 2012, 12:12 pm

Is soil a material considered on this credit?

NC-2009 MRc3: Materials Reuse
posted by Albert Sagrera on Jun 6, 2012, 7:35 am

Would you consider the...

Last reply: Lorne Mlotek, Jun 6, 2012, 9:08 am

Materials Reuse-Clarification of credit implementation

NC-2009 MRc3: Materials Reuse
posted by Elle Brown on May 3, 2012, 7:47 am

Can some one clarify if I'm understanding the implementation of this credit correctly?
If material is salvaged onsite it must be used in a purpose other than for which it was intended (...

Last reply: Susie Spivey-Tilson, May 3, 2012, 11:44 am