Material reuse based on cost or volume

I am working on an international LEED NC 2009 project. They are reusing some things at the site like, making bricks chips out of reused brick for low psi concrete, grinding excess concrete pears to use at substrate or internal pavements. Reusing cement bags for erosion control by filling them with sand. They also sell the scrape steel ties. Is the material reused credit is awarded based on the value of reused material or the volume of the reused material?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 07/12/2013 - 19:30

It is based on cost. In the case of reused materials that you are not paying for, you can assign them a market cost.