Drywall replaced on int. non-structural wallNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Marisa Britton on Sep 18, 2017, 3:29 pm
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation? |
|
RE: Would we exclude interior walls that were never permitted?NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Diane Hale CHMM, CDGP, CEM, CESCO on Apr 29, 2017, 2:32 am
We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant. They were "floating" walls and never anchored to the... Last reply: Megan White, May 1, 2017, 12:00 pm |
|
Finished surface of structural wall?NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on Feb 22, 2017, 2:41 pm
Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks! Last reply: Tristan Roberts, Mar 22, 2017, 11:46 am |
|
Exterior windows and doors?NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on Feb 22, 2017, 4:49 pm
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1? Last reply: Tristan Roberts, Feb 23, 2017, 9:50 am |
|
Are filing cabinets includedNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Farah A. on Feb 23, 2014, 3:37 pm
Are filing cabinets included in the calculations for Maintain Interior Nonstructural Elements? If so, are they included in only the qualifying area or do they count as reusable components for... Last reply: Allison Beer McKenzie, Mar 9, 2016, 9:55 am |
|
Exterior Walls and Ceiling Furred OutNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Sallyann Kluz on Jan 24, 2013, 12:11 pm
We have an existing building that lacked insulation in exterior walls as well as the ceiling. In order to accomodate the new insulation and some additional roof... Last reply: April Brown, Feb 1, 2013, 5:52 pm |
|
Ceiling "Reuse"NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Caroline O'Leary on Nov 29, 2011, 11:28 am
I'm cross posting from CI MRc1.2: I see this was partially covered in Jean's discussion but I'm going to see if any of you have any further clarification. We removed a suspended acoustical... Last reply: Tristan Roberts, Feb 17, 2012, 4:37 pm |
|
Historic plaster to receive new plaster skimcoatNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Rebekah Burke on Feb 16, 2012, 12:52 pm
We are refurbishing a... Last reply: Tristan Roberts, Feb 17, 2012, 3:20 pm |
|
Adaptive ReuseNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Christine Robbins-Elrod on Aug 1, 2011, 3:51 pm
We're working on the adaptive... Last reply: Tristan Roberts, Nov 20, 2011, 9:44 pm |
|
Pre-Existing Fire ConditionNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by George Wilson, AIA on Sep 1, 2010, 1:40 pm
The building had a large amount of pre-existing interior non-structural materials that had to be removed due to fire damage. For example the entire suspended ceiling had fire damage and was not... Last reply: Nathan Benjamin, Sep 8, 2010, 4:43 pm |