Modeling an Elevator with Glass Enclosure with an exterior Curtain WallNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Nov 15, 2018, 10:11 am
Good morning. I am modeling an Elevator with Glass Enclosure with an exterior Curtain Wall and trying to figure out what is the best approach to (1)accommodate/capture the glass... Last reply: Marcus Sheffer, Nov 16, 2018, 12:13 pm |
|
Modeling curtain wallsNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Nov 15, 2018, 9:58 am
Good morning, I'd like to know if anyone can share there best approach to modeling a curtain wall. On the S and W facades, our project has a 22ft tall and 90ft wide curtain wall (shadowbox,... Last reply: Marcus Sheffer, Nov 15, 2018, 2:58 pm |
|
Cooling tower fan powerNC-2009 EAp2: Minimum Energy Performanceposted by Saif Abdulameer on Dec 1, 2016, 11:26 am
Hi all, I am modeling a cooling tower the fan meets the requirement of Appendix G, but I am not sure what is the fan power should be used for the baseline, Should I use the same as... Last reply: Marcus Sheffer, Nov 5, 2018, 3:21 pm |
|
Minimum fresh air rates- Baseline vs. Proposed (90.1-2010)NC-2009 EAp2: Minimum Energy Performanceposted by Greenlab on Oct 29, 2018, 2:45 pmsimulation level for a having a positive feature (increased ventilation). I found different replies on modeling related forums regarding this topic, probably because as you said, it changed from 2007... Last reply: Greenlab, Nov 5, 2018, 4:53 am |
|
Baseline HVAC system with 2 predominant spacesNC-2009 EAp2: Minimum Energy Performanceposted by Yoyo Shek on Oct 31, 2018, 2:46 am
Dear All, We have a projects designed for commercial purpose with 3 main spaces types: Last reply: Marcus Sheffer, Nov 2, 2018, 10:07 am |
|
Hotel- Baseline HVAC TypesNC-2009 EAp2: Minimum Energy Performanceposted by Michael Hammond on Oct 25, 2018, 12:20 pm
I am modelling a hotel project. After assigning the residential zones (bedrooms + access corridors) to System 1 – PTAC, there is approx. 6,700 ft2 of conditioned floor area remaining which... Last reply: Michael Hammond, Oct 31, 2018, 1:27 pm |
|
Energy cost for Baseline and proposed case CHP systemNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Sep 26, 2018, 3:09 am
Dear All Our project uses a... Last reply: David Eldridge, Sep 28, 2018, 12:50 pm |
|
Humidification Plant loadNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Sep 26, 2018, 2:59 am
Dear All:- We have large manufacturing facility with Humidification plant & Chiller The Electrical load of this Humidification plant is about 3000 kW (supply, return fan, Water... Last reply: Marcus Sheffer, Sep 26, 2018, 9:34 am |
|
Appendix G system type for additionNC-2009 EAp2: Minimum Energy Performanceposted by Hilary Giffen on Sep 8, 2016, 4:55 pm
I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition. The addition is 56,000 SF and the whole plant is somewhere... Last reply: Marcus Sheffer, Sep 7, 2018, 12:09 pm |
|
Template v2009 EAp2 filling doubtsNC-2009 EAp2: Minimum Energy Performanceposted by Luis Andrade on Nov 7, 2017, 6:27 am
Hello, The HVAC system I'm modelling has two heat-pumps with a water side energy recovery device, so that it is possible to heat and cool (or dehumidify) the spaces simultaneously and... Last reply: Marcus Sheffer, Sep 7, 2018, 10:49 am |