Topic | Recent |
---|---|
Continuous insulation on the inside of the wall?NC-2009 EAp2: Minimum Energy Performanceposted by David Sheridan on Apr 24, 2012, 10:45 am
Our state energy code is based on ASHRAE 90.1-2004, which I believe does not require ci for exterior walls. ASHRAE 90.1-2007 requires R-3.8 ci for nonresidential walls. The project architect... Last reply: Marcus Sheffer, Apr 24, 2012, 2:07 pm |
|
Baseline service water heaterNC-2009 EAp2: Minimum Energy Performanceposted by Mark Benson on Apr 24, 2012, 10:41 am
In the proposed design, we are using a water-to-water heat pump for the sole purpose of service water heating. Voltage and Amps are 460v and 140 RLA, respectively. It is coupled with an unfired... Last reply: Marcus Sheffer, Apr 24, 2012, 11:22 am |
|
ASHRAE 90.1-2007 Minimum Bldg Envelope RequirementsNC-2009 EAp2: Minimum Energy Performanceposted by P Fanfulik on Mar 28, 2012, 2:37 pmin or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5916 thumbs up March 29, 2012- 3:01 pm NC since this the forum for EAp2 that it was posted under. In general... Last reply: Marcus Sheffer, Apr 24, 2012, 10:26 am |
|
Energy efficiency exemption for fire pumpsNC-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sobral on Feb 17, 2012, 6:22 pm
Does anybody know if electric fire pumps are exempted from energy efficiency requirements? Last reply: Marcus Sheffer, Apr 23, 2012, 5:06 pm |
|
EAp2/EAc1 Renovation Vs. New constructionNC-2009 EAp2: Minimum Energy Performanceposted by Steven Beccia on Apr 16, 2012, 1:46 pm
We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and... Last reply: Marcus Sheffer, Apr 17, 2012, 9:28 am |
|
Demand Charge & 25% Procsee CostNC-2009 EAp2: Minimum Energy Performanceposted by Joey Jiao on Apr 17, 2012, 4:46 am
Hi, everyone, If there is a project with demand charge, how should we deal with the rule of 25% process cost. Last reply: Marcus Sheffer, Apr 17, 2012, 9:16 am |
|
slab-on-grade floorNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Apr 11, 2012, 5:56 am
In Table 5.3 point 5 of annex G of ASHRAE 90.1-2007 I find that for the baseline building performance “opaque assemblies used for new buildings (..) shall confirm with the following common... Last reply: Francesco Passerini, Apr 16, 2012, 4:46 am |
|
Architect SignatoryNC-2009 EAp2: Minimum Energy Performanceposted by Christopher Getz on Apr 12, 2012, 1:43 pm
Does the Architect Signatory have to be a LEED AP? or just a registered Architect? Last reply: Marcus Sheffer, Apr 12, 2012, 2:54 pm |
|
Absorption chiller in baseline modelNC-2009 EAp2: Minimum Energy Performanceposted by Jens Apel on Apr 11, 2012, 3:38 am
Dear all, Last reply: Jens Apel, Apr 12, 2012, 1:27 am |
|
Non-fossil fuel in district heatNC-2009 EAp2: Minimum Energy Performanceposted by Jens Apel on Apr 11, 2012, 3:38 am
This question relates to the thread below (“Absorption chiller in baseline model”) but is of more general nature. The district heating system uses waste and... |