posted by George Bender on Nov 30, 2012, 10:46 am

The project is a railcar vehicle maintenance facility (VMF) a couple acres large. This project falls under new construction and includes a new rail track to be brought into the VMF. I am unsure...

Last reply: Adrienn Gelesz, Dec 6, 2012, 10:06 am

Part Residence and Part Office

NC-2009 EAp2: Minimum Energy Performance
posted by April Ambrose on Dec 3, 2012, 10:03 am

I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential.
I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running...

Last reply: PAWAN DAHIWAL, Dec 6, 2012, 2:26 am

How to model the ventilation system for baseline model.

NC-2009 EAp2: Minimum Energy Performance
posted by La Verne Ramir Certeza on Dec 4, 2012, 11:08 pm

Hello,

I would just like to ask regarding how I should model the ventilation system of my baseline model. My project is a hotel building which uses chilled water as its main cooling medium...

Last reply: Marcus Sheffer, Dec 5, 2012, 5:43 pm

Solar Water Heating Performance

NC-2009 EAp2: Minimum Energy Performance
posted by Jackson . on Dec 2, 2012, 10:16 pm

Hi,
We at climate zone 1, and in normal practices, we use solar water heating storage tank for shower. In ASHRAE 90.1 , table 7.8, which categories of equipment performance we need to...

Last reply: Marcus Sheffer, Dec 4, 2012, 10:55 am

Base case system for high equipment loads spaces

NC-2009 EAp2: Minimum Energy Performance
posted by Nandana Kumar on Dec 1, 2012, 2:06 am

The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft. These high...

Last reply: Marcus Sheffer, Dec 4, 2012, 9:42 am

6.4.3.4 Ventilation System Controls

NC-2009 EAp2: Minimum Energy Performance
posted by Marina Andrade on Nov 28, 2012, 2:14 pm

To comply with the mandatory sections 6.4.3.4 “Stair and Shaft Vents” and 6.4.3.4.2 “Gravity Hoods, Vents and Ventilators”, according to the climate zone 2, the standard requires that gravity...

Last reply: Marcus Sheffer, Dec 4, 2012, 9:40 am

Vertical Glazing

NC-2009 EAp2: Minimum Energy Performance
posted by Denise Shimabukuro on Jan 10, 2011, 8:20 pm

We are assisting a design-build team in Japan with getting their project to be LEED Silver certified. To meet this prerequisite, is it absolutely required to follow ASHRAE 90.1-2007? The project...

Last reply: Marcus Sheffer, Dec 4, 2012, 9:18 am

LEEDuser request for Upload EAp2-16 sample report

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Nov 29, 2012, 5:39 am

Dear LEEDuser,
Could we please have a sample summary report for this upload?
Kind regards,
Jean

Last reply: Marcus Sheffer, Dec 3, 2012, 3:42 pm

Process energy

NC-2009 EAp2: Minimum Energy Performance
posted by Graham Langton on Dec 3, 2012, 4:09 am

Regarding what is taken as a...

Last reply: Anthony Hardman, Dec 3, 2012, 10:19 am

90.1 Envelope Requirements

NC-2009 EAp2: Minimum Energy Performance
posted by Ruben Porter on Nov 30, 2012, 6:52 am

I'm trying to model a...