Hi,

I am assisting with the certification of a shop expansion project that will have a solar system that generates at least 50% of the required energy to run the new addition (I do not know the exact percentage at this time).

Is it still possible to get the maximum of 2 points possible for the green power & carbon offsets credit if the remaining percentage of energy is purchased as required? I did not see anything in the language or guide that stated if the required percentage of energy (50% or 100%) could be the remaining non-green energy consumption, in this case being energy not generated via the spv system.