Topic | Recent |
---|---|
Hotel- Baseline HVAC TypesNC-2009 EAp2: Minimum Energy Performanceposted by Michael Hammond on Oct 25, 2018, 12:20 pm
I am modelling a hotel project. After assigning the residential zones (bedrooms + access corridors) to System 1 – PTAC, there is approx. 6,700 ft2 of conditioned floor area remaining which... Last reply: Michael Hammond, Oct 31, 2018, 1:27 pm |
|
Energy cost for Baseline and proposed case CHP systemNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Sep 26, 2018, 3:09 am
Dear All Our project uses a... Last reply: David Eldridge, Sep 28, 2018, 12:50 pm |
|
Humidification Plant loadNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Sep 26, 2018, 2:59 am
Dear All:- We have large manufacturing facility with Humidification plant & Chiller The Electrical load of this Humidification plant is about 3000 kW (supply, return fan, Water... Last reply: Marcus Sheffer, Sep 26, 2018, 9:34 am |
|
Appendix G system type for additionNC-2009 EAp2: Minimum Energy Performanceposted by Hilary Giffen on Sep 8, 2016, 4:55 pm
I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition. The addition is 56,000 SF and the whole plant is somewhere... Last reply: Marcus Sheffer, Sep 7, 2018, 12:09 pm |
|
Template v2009 EAp2 filling doubtsNC-2009 EAp2: Minimum Energy Performanceposted by Luis Andrade on Nov 7, 2017, 6:27 am
Hello, The HVAC system I'm modelling has two heat-pumps with a water side energy recovery device, so that it is possible to heat and cool (or dehumidify) the spaces simultaneously and... Last reply: Marcus Sheffer, Sep 7, 2018, 10:49 am |
|
Exceptional calculation in newer credit templates for v3 (2009)NC-2009 EAp2: Minimum Energy Performanceposted by Jill Kurtz on Aug 28, 2018, 11:28 am
The exceptional calculations used to be entered into the LEED template but with the streamlined templates, the tables are no longer included in the form. Where do we document exceptional... |
|
EAp2 for a Lab BuildingNC-2009 EAp2: Minimum Energy Performanceposted by Roxanne Button on Aug 19, 2018, 9:28 pm
I have been brought into this project as the LEED consultant at a very late stage (about to start construction). This is the third phase of a large college science facility. This is an... Last reply: Roxanne Button, Aug 21, 2018, 9:52 am |
|
Minimum Efficiency Requirements for combined split type unitNC-2009 EAp2: Minimum Energy Performanceposted by sompoche sirichote on Aug 14, 2018, 11:40 pm
Hi LEED Expert, We are working on a factory project. Most condition area shall be cooled by central chiller plant. But in some conditioned area we decide to use 2 x 140,000... Last reply: Marcus Sheffer, Aug 15, 2018, 10:26 am |
|
More Stringent Energy CodesNC-2009 EAp2: Minimum Energy Performanceposted by Jason Cocek on Aug 10, 2018, 1:55 pmin or register to post comments Jason Cocek LEEDuser Premium Member August 10, 2018- 4:15 pm I realize now I should have posted this in the CI EAp2 forum. I was thinking of the mandatory provisions... Last reply: Marcus Sheffer, Aug 13, 2018, 10:57 am |
|
Energy cost- OffsetNC-2009 EAp2: Minimum Energy Performanceposted by Manikandan S on Aug 10, 2018, 8:49 am
Dear All We are working in a project where the ... Last reply: David Eldridge, Aug 10, 2018, 12:34 pm |