Walkable Streets - Historic

Pilot-Credits PC14:Walkable Streets
posted by  Pat Thomas  on 

Our project is an adaptive reuse of a historic building in a historic district.

1
Fri Mar 23, 2012, 8:21 pm

Evolution of LEED - incremental change or sweeping updates?

General forums
posted by  Mara Baum  on 

All this discussion has caused me to reflect on past versions of LEED, and the changes that have brought us to where we are now.

0

Group Certification and Meters

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  JOHN COOK  on 

We have a situation where we would like to utilize the multiple building approach as a group project for 2 buildings and the surrounding site.

1
Wed Apr 11, 2012, 8:05 pm

PC13 Closed?

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Becky Dix  on 

I was hoping to take part in this pilot credit and see that it has closed. Is it possible to submit similar documentation for an ID credit?

1
Thu Mar 22, 2012, 11:38 pm

Wine Coolers

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Sheela I  on 

Do wine coolers qualify for Energy Star?

1
Thu Mar 22, 2012, 10:34 pm

"Non-Structural" material/Interior walls

Pilot-Credits MRpc52:Material multi-attribute assessment
posted by  stephanie fagan  on 

Would metal framed interior walls need to be excluded from the calculations for this pilot credit?

1
Fri Mar 23, 2012, 12:52 pm

Window to wall ratio

NC-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.

1
Fri Mar 23, 2012, 12:53 pm

Problems with ID&C

General forums
posted by  Melissa Wrolstad  on 

The ID&C system is full of problems where credits have not been translated correctly from BD&C.

0

'installed by substantial completion of construction'

Schools-2009 EAc2:On-Site Renewable Energy
posted by  Sara Goenner Curlee  on 

The letter template has a sign-off for the owner/agent to declare that the renewable energy source (in my case PV solar thermal) is 'installed by substantial completion of construction.' We will be

1
Fri Mar 23, 2012, 4:46 pm