We have a situation where we would like to utilize the multiple building approach as a group project for 2 buildings and the surrounding site. The 2 buildings are metered under 1 gas and 1 electric meter installed by the utilities. If we were to sub-meter one of the building’s gas and electric usage, can we avoid purchasing another sub-meter for the other building if we subtract our sub-meter readings from the main utility meter’s readings? Thank you.