Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Denial of PC9 for non-compliance w/ technical requirements

Pilot-Credits PC9:Street Network
posted by  Michael Miller  on 

We had registered our CI project for PC9 prior to the change to the credit that limited it to Homes projects.

1
Wed Apr 4, 2012, 10:42 pm

EAp2 Labs21 Climate zones

General forums
posted by  Allen Doyle  on 

It would be helpful if there were more than two options for climate zones when using Labs21 benchmark: 1) site zone 2) the nation.

0

Tenant owned chiller with R-11?

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Chris Munn  on 

I am working with a large building in New York. This building has a tenant that has their own chiller that utilizes R-11 refrigerant.

1
Tue Nov 1, 2011, 2:37 pm

Backup Unit

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by     on 

I am working on a project where the main unit is new and thus in compliance but there is a backup unit which uses CFCs.

1
Tue Nov 1, 2011, 2:34 pm

Systems Manual

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Michael Lofroos  on 

Although it is the requirement of the Commissioning Agent to develop the Systems Manual, Operation & Maintenance Systems manuals, can he/she delegate that responsibility to the General Contract

1
Fri Nov 18, 2011, 4:13 pm

One Conductivity Meter for Multiple towers

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  Jessica Hawley  on 

On our project building there is only one system meter. All cooling towers are interconnected with a single header which is monitored by the conductivity meter.

1
Fri Oct 21, 2011, 9:48 pm

PDF Template Question

CI-2009 MRc4:Recycled Content
posted by  elizabeth warlop  on 

Hello, I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.

1
Mon Nov 21, 2011, 6:36 am

Building on parking spaces

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Tanja Arnesson  on 

Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces.

1
Mon Oct 3, 2011, 8:32 pm

Credit Calculations

Pilot-Credits PC19:Whole Building Reuse
posted by  Christine Robbins-Elrod  on 

Hi, I'd like to verify if I have documented this Pilot Credit correctly? -I have included exterior windows in the building envelope calculations since the team is preserving all existing windows (b

0

LEED Project boundary and EAp2, EAc1

NC-2009 EAp2:Minimum Energy Performance
posted by  Kim Sosalla-Bahr  on 

The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building.

1
Mon Oct 10, 2011, 3:50 pm