Forum quick links
expected volume
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Richardson Jean-Baptiste on
Hello all How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f.
Flexible Power Distribution
CI-v4 MRc2:Interiors life-cycle impact reductionposted by roma goyal on
Hello,
I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean?
what are the equipments to be considered for this system?
Lighting Power Density for berth and roadway areas - space by space method
NC-v4 EAp2:Minimum energy performanceposted by Dionisio Franca on
I'm working with a large scale multi-floor distribution center and trying to determine the correct LPD - lighting power densities of the berths and vehicle paths.
Survey and Participation in LEEDUser Forum to Earn the Pilot Credit?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Craig Sheehy on
Hello,
Construction Phases
Hospitality-NC-v4 MPR1:Must be in a permanent location on existing landposted by Larissa Murakami on
We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.
Can anyone share approach taken to comply with this or related Certified Multi-attribute Products and Materials?
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Panu Pasanen on
Hi, this looks pretty demanding spec, as the related "Certified Multi-attribute Products and Materials".
Pilot credit - Building Material Human Hazard & Exposure Assessment
Retail-CI-v4 INc1:Innovationposted by Stacey Olson on
It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm.
Thanks,
Preliminary and Final Design Review Submission - Online Steps for Final Design Review
posted by Stephen Sgro on
We received our preliminary design review report. All credits that were pending and ones requiring revisions have been revised and additional documents have been uploaded.
CALGreen certification as alternate to Watersense?
CI-v4 WEp1:Indoor water use reductionposted by Paladino "Team" on
Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?