Forum quick links
Process Loads Clarifications
NC-v4 EAc2:Optimize energy performanceposted by susan eguia on
1. what is the difference between Bldg. Average equipment power density method and Space by space equipment power density method?
Existing Bicycle Storage at mixed use facility
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Andrew Buck on
Hello, we are adding a Hotel to a large mixed use entertainment destination that already has existing exterior bike racks (approx.
Change a precertification with a certification process
posted by Sandro Paglia on
Goodmorning to all,
LCA & EPD Review
NC-v4 MRc1:Building life-cycle impact reductionposted by Dung Bui on
Hi all,
I am researching LCA/EPD and have a question concerning:
- I should have my LCA/EPD reviewed or verified by a third-party before LEED application.
Impact of the suspension period (3 years) on the Certification’s points score
posted by Johann Barata on
Generalities:
I am currently working in a 50 floors building construction here in the Middle East.
Exterior lighting requirements - BUG method?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Erica Downs on
Hello - does anyone know if this credit can be achieved via the BUG method v4 option? Or must the requirements be met with a photometric plan? Seems silly to have to do v3 documentation
Interior lighting requirements?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Erica Downs on
Hello - Clarification question...