TSS efficiency valuesNC-2009 SSc6.2: Stormwater design - quality controlposted by Albert Sagrera on Apr 19, 2013, 7:41 am
Hi! Last reply: Michael DeVuono, Apr 19, 2013, 10:43 am |
|
LEED BoundaryNC-2009 SSc6.2: Stormwater design - quality controlposted by Antwon Williams on Apr 17, 2013, 5:16 pm
I would like to know what determines the site boundary for capturing the 90% anual rainfall total. Does the treatment area have to be the entire site boundary? Last reply: Nadia Ayala, Apr 18, 2013, 5:12 pm |
|
Site Area as it relates to 6.2NC-2009 SSc6.2: Stormwater design - quality controlposted by Anthony Venafro on Mar 7, 2013, 4:30 pm
Can we eliminate site area to be dedicated for the computations for 1" of rainfall? i.e. existing site area is 5 acres witih a 1" volume of 14,000 cf. 0.5 acres will be dedicated to state use... Last reply: Michael DeVuono, Mar 12, 2013, 2:29 pm |
|
some doubtsNC-2009 SSc6.2: Stormwater design - quality controlposted by Albert Sagrera on Mar 6, 2013, 11:36 am
Hi, in our project we have a 60% of the site vegetated, planted with meadow, we have a small impervious surface near the building, and the building itself. We understand that the vegetated area... Last reply: Albert Sagrera, Mar 6, 2013, 12:23 pm |
|
Treating stormwater only?NC-2009 SSc6.2: Stormwater design - quality controlposted by Nicole Kimoto on Feb 27, 2013, 8:18 pm
Could this credit be achieved if it were only proposed to treat the storm water runoff with a structural measure and not capture? It would also need to accommodate at least 90% of the annual... Last reply: Michael DeVuono, Feb 28, 2013, 7:09 am |
|
Structural control and LEED boundaryNC-2009 SSc6.2: Stormwater design - quality controlposted by John Beeson on Mar 8, 2010, 5:25 pm
Can the storm water management structural control be located outside of the LEED project boundary? Last reply: Tristan Roberts, Feb 19, 2013, 4:14 pm |
|
BMPs in seriesNC-2009 SSc6.2: Stormwater design - quality controlposted by Tristan Roberts on Jan 30, 2013, 10:19 am
I heard a comment from a LEED user that... Last reply: Michael DeVuono, Jan 30, 2013, 10:27 am |
|
Which type of water needs to be filtered?NC-2009 SSc6.2: Stormwater design - quality controlposted by Marcio Alberto Casado Pereira on Jan 23, 2013, 11:01 am
Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct? I'm asking because the client... Last reply: Michael DeVuono, Jan 29, 2013, 7:47 am |
|
TSS removal with veg. roof, cistern and reuse- but no filterNC-2009 SSc6.2: Stormwater design - quality controlposted by Elizabeth (Zeba) Floyd on Dec 19, 2012, 7:00 pm
The Design Team for an urban office bldg. proposes to collect water from roof and terraces as well as mech. condensate for... Last reply: Michael DeVuono, Jan 7, 2013, 3:17 pm |
|
Combination Campus / On-site approach?NC-2009 SSc6.2: Stormwater design - quality controlposted by Cara Sloat on Dec 11, 2012, 12:17 am
I'm working on a Canadian, CAGBC LEED NC 2009 project that is located with a business park. The business park's water treatment system, a constructed... Last reply: Cara Sloat, Dec 14, 2012, 4:26 am |