Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Green field but planned for development in an industrial zone

NC-v4 LTc2:Sensitive land protection
posted by  Thomas Tan  on 

Dear All,

I have a project which will be built on a lot located in a industrial zone. The lot is used to be natural land but filled up with sand now.

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Mon Nov 16, 2020, 4:09 am
1
Thu May 13, 2021, 7:17 pm

MR BPD&O Calculator v4.1

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Agnieszka Rylska  on 

Hello,

I would like to replace the v4 credit with v4.1 equivalent and track the credit status via appropriate calculator. Could you tell me where can I find the right editable document?

12
Sun Nov 15, 2020, 11:26 pm

Defining Outdoor Social Activities

NC-v4 SSc3:Open space
posted by  Dee Spiro  on 

We've been discussing this internally and have people on both sides of the fence.

2
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Sat Nov 14, 2020, 4:02 pm
6
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri Nov 13, 2020, 9:38 pm

How to document the Quality View Simulation Results from IES VE?

CS-v4 EQc5:Quality views
posted by  James Cai  on 

I have simulated the quality view in the IES VE and created a report according to the simulation results.

2
Fri Nov 13, 2020, 7:35 pm
3
Fri Nov 13, 2020, 3:16 pm

ENERGY STAR equipment Wattage

CI-v4 EAc2:Optimize energy performance
posted by  Michael d  on 

When inputting ENERGY STAR equipment wattage, do we include the idle, average or maximum wattage used by the equipment?

1
Fri Nov 27, 2020, 6:01 pm

Extraction point for recycled content

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Jill Kurtz  on 

In the v3 reference guide, changes were made to clarify recycled content could define "the extraction point for recycled materials is the location of the raw material prior to the manufacturing of

1
Fri Nov 20, 2020, 11:58 am