Forum quick links
Opportunity to participate in Fifth National Climate Assessment Workshops
posted by Mary Ann Lazarus on
Hi SDLers: See the great opportunity to weigh in on the 5th National Climate Assessment at a series of workshops in early 2022.
Register here:
Refrigerant of cooling system of tenant’s Data Center in LEED CS
CS-2009 EAc4:Enhanced Refrigerant Managementposted by F. Borja López Calle on
We are participating in LEED CS v2009 certification in an office building.
This project consists of changing the HVAC system in the building.
Energy consumption associated to Data Center, UPS and cooling systems in LEED CS
NC-2009 EAp2:Minimum Energy Performanceposted by F. Borja López Calle on
We are participating in LEED CS v2009 certification in an office building.
This project consists of changing the HVAC system in the building.
Metabolic Rates not covered by the referenced standard
NC-v4 EQc5:Thermal comfortposted by Dave Hubka on
The CBE Thermal Comfort Tool LEED allows for analysis of this credit has been updated to ASHRAE Standard 55-2020.
Preparing concept HVAC requirements
NC-v4 EAc2:Optimize energy performanceposted by Dina El-Sady on
Is it a must to start a simple box energy model for a new project to extract HVAC requirements to acheive a certain level of energy savings?
Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?
Test duration
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Dionisio Franca on
The site noise assessment must be at least 24 hours long. Is there a similar requirement for the post-construction test?