Forum quick links
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
Can this credit be achieved if no minimum local code requirement
CI-v4 LTc5:Reduced parking footprintposted by Juliana Moreira on
I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces.
Offsite donation compensation
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cesar Ruiz on
I have a project with a large previously developed area.
Occupancy from areas not in LEED scope
CS-2009 PIf3:Occupant and Usage Dataposted by David Lazaro on
Hello, We are certifying a building which has undergone a major renovation above grade.
How to apply base ratios for non-specified usage type?
CI-v4 LTc5:Reduced parking footprintposted by Jonathan Weiss on
For a laboratory / office building, how do you apply the baseline? It appears that you pro-rate the usage by area of each space type, but laboratories are not a listed usage type.
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
Quality Assurance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Can anyone help with the following LEED reviewer comment that we received.
LEED V4 -Healthcare Or NC
posted by DON JUNIOR on
I am part of a team, trying to decide on which rating system to use for a new construction project. Our project is a hospital outside US (located in Middle East).
Conditions for site fence
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Julian Bork on
Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th
Projects constructed by diferent owners, same property managment
posted by Pedro Urazan on
Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.