Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Demolition Waste for entire building vs area designated to be LEED Certified.

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Timothy Hillhouse  on 

We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft.  Should all the construction waste & recycling only be calculated for the small area being cer

1
Thu May 10, 2018, 10:59 pm

D & C Team perform Commissioning, CxA only Verifies?

NC-2009 EAc3:Enhanced Commissioning
posted by  Adrian Arenas  on 

Our project is pursuing Enhanced Cx credit v2009.

0

Min. Number of Fixtures

NC-v4 WEc2:Indoor water use reduction
posted by  Cora Kenrick  on 

Hello Fellow Users,

 

Is there a minimum number of fixtures that a project is required to get the 6 points for this credit.

 

3
Energy Engineering Specialist
LEEDuser Basic Member
0 thumbs up
Tue May 1, 2018, 10:15 pm

materials not used in the original construction are verified in the re-evaluation of the certification?

LEED Recertification: When and How
posted by  ANDREZA PASSOS  on 

I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue May 1, 2018, 4:38 pm

BITuser experts

BITuser
posted by  Andrea Lemon  on 

I'm working on the Best Practice pages, and I want to verify the role of "BITuser experts" (analogous to LEEDuser experts, as shown on

6
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Tue May 1, 2018, 4:23 pm
0

Credit Review

CS-v4 INc2:LEED Accredited Professional
posted by  Luis Fretes  on 

Can we submit construction credits for review during design?

1
Thu May 17, 2018, 1:15 am

parking garage

EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distribution
posted by  Alison Rizzo  on 

Does there have to be a MERV13 filter on makeup air units supplying outdoor air for parkade exhaust?

1
Tue May 1, 2018, 7:11 pm

Landscaped area on a podium

NC-2009 WEc1:Water Efficient Landscaping
posted by  Lindsay Duthie  on 

My project consists of some landscaping at grade (2%) and the majority of landscaping on the podium level (18%) for a combined landscaped area that is about 20% of the site. 

1
Wed May 2, 2018, 6:21 am

Furniture refurbishment - 30%

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Kriss Kokoefer  on 

How do I find out if any certified companies have received a point for refurbished furniture?  The point is awarded if 30% of the furniture or furnishings are refurbished, reused or salvaged.&

0