Drywall scrap
CS-2009 MRc2:Construction Waste Managementposted by Tobie Nepo on
Our contractor proposes to take scrap drywall (new construction) to a landfill where it will be used as "alternate daily cover".
Project boundary within an existing building
CI-2009 SSc2:Development Density and Community Connectivityposted by R Jones on
Hi - when doing the calculations for option 1 - should i include the sf of the project (ie tenant space) or the whole building - then divide it by the area.
Wood as thermal barrier
NC-2009 EAc1:Optimize Energy Performanceposted by javier bolanos zeledon on
Is it valid to use 1" wood as thermal barrier for the construction of roof insulation.
Major renovation
NC-2009 EAc1:Optimize Energy Performanceposted by javier bolanos zeledon on
This is a major renovation of an old office building. The new building will use structural walls and metal roof of previos building.
IT ROOM LOADS
NC-2009 EAc1:Optimize Energy Performanceposted by javier bolanos zeledon on
In an IT room there are envelope loads and equipment loads due to HVAC needed to cool the space. Also the electric load due to the IT equipment running.