NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Marcio Alberto Casado Pereira  on 

Hi folks, In need of some light on a review we received. We have a multiple buldings Project. there are 4 LPBs inside of the LCB.

2
Mon Sep 30, 2013, 7:24 pm

District heating/cooling and On-site renewables

ND-v2009 GIBc12:District heating and cooling
posted by  Colin Day  on 

Hello Eliot, The project I am working on is a mixed-use (mostly residential) neighborhood. There will be solar PV on every home as well as ground source heat pumps.

4
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Sep 30, 2013, 4:38 pm

How can I provide blower door test results before occupancy?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  adi ashkenazi  on 

Hi, On the credit form I must upload blower door test results but this credit is a design phase credit and the test is only after construction is complete.

3
Fri Sep 27, 2013, 8:58 pm
3
Default Avatar
Senior Sustainability Consultant
Steven Winter Associates, Inc.
LEEDuser Basic Member
72 thumbs up
Fri Sep 27, 2013, 6:30 pm

Rainwater cistern and greenroof

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Mike D  on 

Our project will capture rainwater for the irrigation of the green roof and for the flushing of WCs in the building.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Sep 27, 2013, 4:05 pm

CO2 sensors in return ductwork?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Maura Adams  on 

The CO2 sensors for this science building are in the return ductwork, not 3-6' from the floor. I'm telling the team that this is clearly not in compliance, but the Honeywell rep insists otherwise.

3
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Fri Sep 27, 2013, 3:50 pm

Same product, multiple contractors

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lewis Hewton  on 

Hi all, quick query regarding filling out the online submission form: If we have multiple contractors (i.e.

2
Partner, Architecture & Sustainability
DIALOG
LEEDuser Premium Member
449 thumbs up
Fri Sep 27, 2013, 3:02 am

Old EB:O&M

LEED Rating System Selection
posted by  Kath Williams  on 

If a project was certified under the first version of LEED-EB:O&M and was not REQUIRED to recertify, is the project considered "certified in perpetuity"?

6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Sep 26, 2013, 8:17 pm
8
Thu Sep 26, 2013, 3:16 pm

LE/FE: Mixed-Use Project--Preferred Parking for Retail Too?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Brooks Critchfield  on 

We have an urban mixed-use project--about 90% residential and about 10% retail. We are building new parking for the residential units only.