Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Medical Supplies

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Aurélie Kazour  on 

I am working in a hospital trying to meet the Sustainable Purchasing standards.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Oct 27, 2014, 8:09 pm

Contract between owner and CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Gina Dederer  on 

We recently had this credit denied based on the fact that our contract did not explicitly state that the 10 month follow-up review is included in the activities of EAc3, even though we provided a c

3
Sun Oct 26, 2014, 2:44 am

Commissioning of renewable energy systems

NC-2009 EAc3:Enhanced Commissioning
posted by  Peg Manuel  on 

EAc3 requires the individual serving as the CxA to "be independent of the work of design and construction." It also states this person "must not be an employee of, or contravted through a contracto

2
Sun Oct 26, 2014, 2:37 am

Building Components

posted by  Keith Lindemulder  on 
3
Fri Oct 24, 2014, 8:41 pm

Stair nosing

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Yuko Murata  on 

Hi Everyone, We have stainless steel stair nosing with anti-slip PVC strips on our stairs.

4
Fri Oct 24, 2014, 12:02 am

LEED: Homes eligibility?

LEED for Homes (LEED-H) Forum
posted by  Erica Downs  on 

Hello - We are starting major construction of our home, consisting of a gut-reno of the first floor; addition of a 2nd floor plus attic and porch; new mechanical systems, plumbing, electrical, wind

2
Program Manager, LEED for Homes
Steven Winter Associates, Inc.
LEEDuser Basic Member
8 thumbs up
Thu Oct 23, 2014, 7:54 pm

Exception b. of G3.1.1 and setpoint temperature

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Exception b. of G3.1.1 states: “use separate single-zone systems (..) for any spaces that have occupancy or process loads or schedule that differ significantly from the rest of the building”.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Oct 23, 2014, 3:13 pm

Chilled water pumping head > baseline design

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, h Has anyone come across issues with the chilled water pumps in the proposed and baseline building W/gpm being very different.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Oct 23, 2014, 3:08 pm

Option 1 plus Option 2?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Lawrence Lile  on 

I have a number of products that meet floorscore, but one that meets California Section 01350 but doesn't mention floorscore. Can I mix and match option 1 and 2?

2
Thu Oct 23, 2014, 3:00 pm

New Product

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Stefanie Smith  on 

Hello, Has anyone encountered a product that is new on the market and therefore is still in the process of becoming FloorScore Certified?

3
Default Avatar
AIA
Stark State College
LEEDuser Basic Member
4 thumbs up
Thu Oct 23, 2014, 2:57 pm