Problem with Rainfall Event Calculator

NC-v4 SSc4:Rainwater management
posted by  Timothy Ian Middleton  on 

We have just realised that the percentile value given by the LEED Rainfall Event Calculator (https://www.usgbc.org/resources/leed-v4-rainfall-events-calculator) was incorrect, just before implement

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Oct 5, 2022, 5:03 pm

Material Ingredient Reporting

LEED v4.1 Discussion Forum
posted by  Elinor Sullivan  on 

When I have been inputting types of material ingredient reporting ie: Declare lable, HPD etc..

0

Project in Europe: Do I need to upload the Loacal Permission of the Project?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stephan Zweig  on 

Hello,

I have a project in Europe, at the leedonline platform do I need to upload for the project the  building permission of the government?

1
Fri Oct 7, 2022, 9:13 am

OPR and BOD docunets

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stephan Zweig  on 

Hello,

at the LEED on line platform for the LEED Documentation do we need to upload the documents

Owners Project Requirements (OPR)  and the Basis of design (BOD)?

0

Baseline System for District Energy System (DES) Option 2

NC-v4 EAc2:Optimize energy performance
posted by  Keith Lane  on 

I'm working on a 73,000 s.f. clasroom building that has air-cooled chiller and boiler plants connected to a seperate building so need to follow the DES guidelines.

3
Default Avatar
Project Engineer
GGD Consulting Engineers
LEEDuser Basic Member
0 thumbs up
Tue Oct 4, 2022, 11:56 pm
6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 4, 2022, 9:46 pm

Modification of the lighting boundary - 4 lane street

NC-v4 SSc6:Light pollution reduction
posted by  Anna Korinkova  on 

Hello everyone,

I would like to ask for a clarification related to the allowed modification of the lighting boundary.

2
Tue Oct 4, 2022, 9:23 pm

V4 BDC Multifamily Midrise LEED AP Homes point out of reach

NC-v4 INc2:LEED Accredited Professional
posted by  Sue Bryant  on 

The V4 requirement is for a LEED AP Homes to be on the project team. That team member, however, cannot be part of the verification team.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Oct 4, 2022, 6:56 pm