Forum quick links
Core and Shell area and Tenants area
CS-2009 EAc6:Green Powerposted by Vassil Vassilev on
Greetings,
Pursuing EAc6, Option 1, for office building registered as C&S for LEED certification, the following issue is kind of not clear to me:
Bird collisions/Interference in the migratory route
Pilot-Credits SSpc55:Bird collision deterrenceposted by Ricardo Gomes on
I’m curious if there is a pattern flight height for migratory birds.
Exact Definition of LEED project boundary , Property Line
CS-v4 MPR2:Must use reasonable LEED boundariesposted by RAMON CHRISTOPHER MEDRANO on
I have a difficulty in declaring, documenting between the LEED PROJECT BOUNDARY to PROPERTY LINE can you give me the exact definitions of LEED PROJECT BOUN
Opportunity to participate in Fifth National Climate Assessment Workshops
posted by Mary Ann Lazarus on
Hi SDLers: See the great opportunity to weigh in on the 5th National Climate Assessment at a series of workshops in early 2022.
Register here:
Refrigerant of cooling system of tenant’s Data Center in LEED CS
CS-2009 EAc4:Enhanced Refrigerant Managementposted by F. Borja López Calle on
We are participating in LEED CS v2009 certification in an office building.
This project consists of changing the HVAC system in the building.
Energy consumption associated to Data Center, UPS and cooling systems in LEED CS
NC-2009 EAp2:Minimum Energy Performanceposted by F. Borja López Calle on
We are participating in LEED CS v2009 certification in an office building.
This project consists of changing the HVAC system in the building.
Metabolic Rates not covered by the referenced standard
NC-v4 EQc5:Thermal comfortposted by Dave Hubka on
The CBE Thermal Comfort Tool LEED allows for analysis of this credit has been updated to ASHRAE Standard 55-2020.
Preparing concept HVAC requirements
NC-v4 EAc2:Optimize energy performanceposted by Dina El-Sady on
Is it a must to start a simple box energy model for a new project to extract HVAC requirements to acheive a certain level of energy savings?
Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?