Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

No RP for zip code

NC-2009 RPc1:Regional Priority
posted by  Brian Wolfe  on 

The zip code I used for a campus project is not registering any RP credits. It is a NC project. Do I change the zip code to the city's, in the project data list for the RPs to register?

3
Default Avatar
Principal
Ecological Environments, LLC
LEEDuser Premium Member
14 thumbs up
Thu Feb 8, 2018, 6:16 pm

WS 2018--Resilience & RELi

SD Leaders
posted by  Nadav Malin  on 
  • Does having a rating system change the conversation?
  • How well defined are the metrics for resilience?
  • How to measure success?
  • Does the RELi Rating System provid
2
Principal, Sustainable Design Director
SWBR
LEEDuser Premium Member
0 thumbs up
Thu Feb 8, 2018, 5:12 pm
3
Thu Feb 8, 2018, 3:04 pm

C&S office now with Upgraded Core and Shell Services in Tenancies

CS-v4 EAp2:Minimum energy performance
posted by  James Duggan  on 

Hi, I'm working on an office C&S project.  Up until recently the MEP strategy was natural ventilation of all tenancies and for this reason the tenancy was envisaged to be modelled that way

0

Campus setting, trespass boundary criteria clarified?

NC-v4 SSc6:Light pollution reduction
posted by  Vince Briones  on 

The V4 BD+C reference guide notes "When additional properties owned by the same entity responsible for the LEED project are contiguous to the project site and have the same or a higher lighting zon

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Feb 8, 2018, 2:02 pm

Can furniture be included?

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Ashley Hu  on 

Hi everyone,

it sounds like a silly question, but can furniture be included for MR BPDO - Material Ingredients Option 1?

1
Tue Feb 13, 2018, 8:32 pm

Enhanced Commissioning with a DES

NC-v4 EAc1:Enhanced commissioning
posted by  Deborah Lucking  on 

All - looking for clarification to this para from the v4 BD+C Reference Manual (page 401):

1
Sun Feb 25, 2018, 12:01 am

Not sure what we can do with this credit

EBOM-v4 SSc6:Site improvement plan
posted by  Meier Corporate Account  on 

Our facility was constructed in the center of 96 acres of asphalt. The area had been asphalt for well over 20 years before this.

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Wed Feb 7, 2018, 4:21 pm