Forum quick links
Kitchen Equipment Baseline Energy Consumption Calculation
CI-v4.1 EAp2:Minimum Energy Performanceposted by Timothy Howarth on
I have calculated the energy consumption from kitchen equipment on my project using the schedule of appliances from the kithcen designer, the manufacturer data for peak equipment load or daily
EPA LEED CHP Calculator?
NC-v4 EAp2:Minimum energy performanceposted by Erin Holdenried on
Has anybody used the EPA LEED CHP Calculator on a LEED project? As the the name suggests, it was made specifically for LEED projects (though it states for early assessment only). W
Contractors Rock!
posted by Anne Hicks Harney on
They do, seriously. They are fine people with tons of information, and without them, all of us Architects would be, well, out of luck.
View Factor 3
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by James Bell on
I have seen several references to View Factor 3 and cannot find any definition.
Registration to Pilot-Credit INpc155
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Vassil Vassilev on
Greetings,
There is a problem when attempting for a Registration to this Pilot-Credit.
Framework for Design Excellence task group recruitment
posted by Anne Hicks Harney on
I have been asked to recommend folks to join the AIA’s Framework for Design Excellence. The AIA Framework for Design Excellence is basically the top ten toolkit, that has been rebranded by th
Distance to the access point within the limit or not
Healthcare-v4 SSc7:Places of respiteposted by Priscillia Champagne on
Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital.
Bicycle Facilities - Shower requirement
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time.
Fundamental Commissioning of On-Site Solar Array
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Williams on
I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.