Exterior Disinfectants
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Michelle Rosenberger on
We have an urban project that is adjacent to an alley way. The project has an issue with public urination in that alley. As a result, they use security patrols to dissuade the practice.
SSc4.3 as it relates to SSc4.4 Opt 3 "no new parking"
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jason Biondi on
Our project is a new classroom building, on a college campus, whereby no new parking is being built or provided.
Table 1 is compulsory
EBOM-v4 WEp1:Indoor water use reductionposted by OSCAR DE LA RED on
it is required to comply with the table 1 for each fixture as it seems to state in the establisment period for option 1 calculated water use, or it is enough to comply with the baseline 120% o 150%
Indoor water use Reduction Calculator bug
EBOM-v4 WEp1:Indoor water use reductionposted by OSCAR DE LA RED on
There is a bug in the Indoor water use Reduction Calculator when there is no urinals, the male water closet uses per day are set to 4 instead of 3 uses per day. How can we solve this?
VOC Compliant Chemicals - IEQ3.3
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Jessica Wasmuth on
I am working on compiling a list of our Green Chemicals used onsite for a LEED certification.
Confused about Perf periods and 2-yr contract for offsite REC's
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Wendy Parker, LEED AP on
We purchased REC's (Texas products) for backdates 3/13 to 3/14 AND going forward 3/14 to 3/15 to cover both the Perf Period AND the 2 yr contract requirement for the credit.
Addition added after documentation has been submitted
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Angela Bickford on
I think I know this answer to this, but I can't find an answer anywhere so I would like someone else's opinion. I'm working on a LEED for schools project. About 3/4 of the building was renovated.
Concrete Washout
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hello everyone, we are working on a project in an estate, part of this estate is the current LEED project, with its own LEED boundary.
Wind renewable energy- Green Powert
NC-2009 EAc6:Green powerposted by Ramesh Narayanan on
One of our client has already own the wind turbine for 100% of the buildings electricity. They want to show that wind turbine power to meet the LEED requirement.
Modeling Heat Reclaim in EAp2 v2009
NC-2009 EAp2:Minimum Energy Performanceposted by Mario S. on
Hello, We are working on a project that uses heat reclaim as a source of energy for service hot water.