Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
SRI Values for Precast Concrete?
NC-v4 SSc5:Heat island reductionposted by Brian Salazar on
Hello - Has anyone found a published study or list of SRI values for precast concrete when used as a roof material, specifically as the top level of a parking structure?
Circular Products -Pilot Credit Attempt
Pilot-Credits MRpc131:Circular Productsposted by Patty Lloyd on
Hello, I am attempting this pilot credit and am finding a couple of the pathways to be difficult to achieve.
No outdoor lighting?
NC-v4 SSc6:Light pollution reductionposted by Deborah Lucking on
We have a project that has no exterior lighting - not even emergency egress, as the travel paths go through an existing, compliant building.
UGR>19 In Cleanrooms
posted by James G on
We have recently come across a scenario where LEED compliance is required in a cleanroom.
Construction Waste Management - use of materials for shoring, etc.
NC-v4.1 MRp2:Construction and Demolition Waste Managementposted by Erik Heuler on
If a contractor uses demolished lumber as temporary shoring on a project does that count as material reuse or diversion from the landfill?
Surrounding Density - Future Development
NC-v4 LTc4:Surrounding density and diverse usesposted by Laura Smith on
We are working on a project that does not yet meet the density requirement but is expected to see substantial development in the near future.
Energy model pump baseline for ultra tall buildings
CI-v4 EAp2:Minimum energy performanceposted by Samantha Allen on
Has anyone run up against issues in energy modelling for spaces in ultra tall buildings? LEED baseline in IES 6x lower than the actual for the building.
MERV 14 and WELL
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Chris Osterhoudt on
For projects pursuing WELL certification in tandem with LEED, MERV filtration requirements are already being met, and ventilation strategies are outlines in the Sequence of Operations as part of th