switch from LEED EBOM 2009 to v4
posted by FRAGKISKOS LEVANTIS on
If I register today for EBOM 2009, can I switch in a couple of months to v4? And if yes, what is the cost of the switch? I want to run two gap analyses for my client, one for each version.
Certified Wood - Chain of Custody - Fabricator
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Catherine Blakemore on
Does the fabricator / manufacturer of a product that incorporates wood components have to be FSC certified in order for the wood components to count toward the certified wood portion of the MRc3 cr
Polypropylene raised floor - does it need floorscore?
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Adriana Hansen on
Hi, My project is an office building and they want to leave to the tenants a polypropylene raised floor.
Entry Mats: Interior or Exterior?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Saju Varghese on
Reading the reference guide, they say the following: "Incorporate permanent entryway system at all high-traffic exterior to interior access points to reduce...", also "employ permanent entryway sys
Modeling the envelope
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
Two short questions about modeling the envelope: 1. For my proposed model, am I required to follow the tables from appendix A even when my project is outside the US?
Share your lessons learned at Greenbuild
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Mara Baum on
I am co-chairing a Greenbuild presentation, "LEED for Healthcare: Lessons Learned from the First 3 Years".
Centrally metering network
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ron Dean on
I'm working on a residential project that doesn't have a centrally monitored metering network.
Regularly occupied
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Adrienn Gelesz on
Hi, according to ID#100000426 MADE ON 07/19/2010, the wording changed from: "In mechanically ventilated buildings, install new air filtration media in regularly occupied areas prior to occupancy.
53000 SF in LEED Boundary
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
We have been contracted to do the fundamental commissioning for a college building that we also designed.
Cant find 2.1(b) and c()
Homes-v2008 IDc2:Durability management processposted by david harrington on
4.Incorporate the measures from 2.1(b) and (c), above, into project documents (drawings, specifications, and/or scopes of work, as appropriate).