Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MRc4.2 Copper Piping Joints

LEED for Healthcare forum
posted by  Simon Sue  on 

Per the LEED reference guide and LEEDonline signatory, copper piping joints can only be one of the following: - mechanically crimped - soldered in compliance to ASTM B828 with flux in compliance to

5
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Fri Jul 6, 2012, 8:39 pm
3
Director of Environmental and Engineering Services
Eggers Division - VT Industries
LEEDuser Basic Member
28 thumbs up
Fri Jul 6, 2012, 3:30 pm

Door proximity

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Elizabeth Crenshaw Hammitt   on 

Is it an issue if the door to the smoking room is under 25 feet away from a door that leads to a porch area?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 1:52 pm

Polycyclic aromatic hydrocarbons, PAH

NC-2009 SSc3:Brownfield Redevelopment
posted by  Tanja Arnesson  on 

Hi, My project just got back our Design 2 review, just after we sent in the design credits for the second review the project found old telephone poles within the ground at our project.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Jul 6, 2012, 6:52 am

FTE in a dormitory

Calculating FTEs
posted by  Ashlee Paar  on 

we received feedback on a recent project that asks us to "distinguish between occupants and residents".

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 6:21 am

Adjustable valve for WC fixtures

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly.

2
Default Avatar
Blackney Hayes Architects
LEEDuser Basic Member
0 thumbs up
Fri Jul 6, 2012, 2:08 am

Compliance through natural ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Udana Ratnayake  on 

We have a canteen area in one of our projects that is to be naturally ventilated through open windows and ceiling fans.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 1:08 am

IEQc2 - Why haven't we been awarded the credit?

NC-2009 IEQc2:Increased Ventilation
posted by  Mairead Morrissey  on 

Hi, We have an overall 30% ventilation above ASHRAE, for each individual space.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Jul 6, 2012, 12:59 am

ID credit for Green Education- Signage change

NC-2009 IDc1:Innovation in Design
posted by  Valerie Molinski  on 

I have achieved an ID credit for my client in the past, based on fulfilling two of the three requirements of the CIR.

3
Environmental Stewardship Manager
Tarkett North America
LEEDuser Basic Member
64 thumbs up
Thu Jul 5, 2012, 10:20 pm

IEQ 4, Low-Emitting Materials – Group 2: Wall and Ceiling Finis

LEED for Healthcare forum
posted by  Bruce Maine  on 

We have a master specification for an Acoustic Tile Restoration System. ProKote is the Base Manufacturer.

3
Sustainable Design Consultant
LEEDuser Basic Member
51 thumbs up
Thu Jul 5, 2012, 8:18 pm