Forum quick links
appeal process
posted by Courtney Royal on
after you submit an appeal (pretty straightforward, just making further claifications), will the GBCI review just make one more review or say we missed something again, will we get comments back?
EAP2 case 1 for international projects
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Elodie DUMAS on
I have a question about the following statement from above : "We have an international project and the space type is eligible for an Energy Star rating.
Better to include PV in the ASHRAE model or calc outside?
NC-2009 EAp2:Minimum Energy Performanceposted by Carol Roberts on
We are working on an ASHRAE 90.1 model in Nevada and are adding the solar information manually to the LEED online forms, post energy modeling (so our solar energy is not appearing on the software g
Window to Wall ratio uniform?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I recently noticed LEED Reference Guide for EAc1 Example Option 1 (p278) says we need to redistribute the window to wall ratio uniformally on each orientation of the building.
Soil used as filling material can count for MRc5?
CS-2009 MRc5:Regional Materialsposted by Alicia Villanueva on
Does the soil used as filling material for the construction can count for MRc5? It is permanently installed in the building, and the Reference Guide doesn´t mention it as in MRc2 where excavated so
Planned City Bus Stop and Shuttle?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Cynthia Estrada on
I've seen a few postings but no solid information on whether or not GBCI will accept verified plans for either a shuttle bus and/or a planned additional bus stop to an existing route.
Equipment Baseline
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by LUCY WILLIAMS on
Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.
Non occupied spaces
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Hello, Is nonoccupied spaces are affected by this credit ?
Data center floor area like an unoccupied space
posted by Paola Moschini on
Hi everybody, Do I have to consider the data center floor area the whole area including corridors and stairs that are exclusive use of the data center or just the rooms where the CED devices are ph
RECs for Europe
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Charalampos Giannikopoulos on
Could you advise of a list of REC vendors who could provide offsite renewable energy for a project located in Europe (Greece)?