We are working on an ASHRAE 90.1 model in Nevada and are adding the solar information manually to the LEED online forms, post energy modeling (so our solar energy is not appearing on the software generated report). We are aware that this will require additional documentation to be provided to the LEED reviewer. However, we need clarification on what would be an acceptable method of calculation for the annual output? And what documentation must be provided?

Also, would a CF1R PV calculation be an acceptable annual output for the state of California?