Forum quick links
Seismic isolation system
NC-2009 MRc4:Recycled Contentposted by Noriko Nagazumi on
Hi, Our project includes seismic isolation system, because the project building is located in earthquake prone country.
Non Regularly Occupied Spaces
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by James Keohane on
RE: CO2 Sensors for Densely Occupied Spaces Are spaces designated as Non-regularly Occupied Spaces excluded from consideration as Densely Occupied Spaces??
WEc3 vs WEc1
EBOM-2009 WEc3:Water Efficient Landscapingposted by Charalampos Giannikopoulos on
If we install subsystem metering for the irrigation systems to comply with WEc1 can we follow the “Non-Metered Irrigation” option at WEc3?
Assembly U-value Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, I’d like to ask a question about the assembly U-value calculation according to NFRC norms.
LEED NC or LEED for Healthcare?
posted by Elisa Sirombo on
Dear All, We are working on a project located in Italy, which would pursue the LEED certification under a 2009 version and we are wondering about the most appropriate rating system to use. The pr
Eyeball Audits as Backup for Commingled Diversion
NC-2009 MRc2:Construction Waste Managementposted by Michelle Rosenberger on
Our Seattle region has a very developed state regulated construction waste diversion infrastructure.
Process Energy Savings - Exceptional Calculation - Dry Coolers
NC-2009 EAc1:Optimize Energy Performanceposted by MYRON JORDAN on
My inquiry is based upon reducing the energy consumption of a chilled water system which is being used in a manufacturing facility.
VRF System Rc Value
NC-2009 EAc4:Enhanced Refrigerant Managementposted by SAMY Chamy on
we use VRF system for A/c we use value given in LEED guide Rc 2.2 lb/ton As per the the default calculation we get points but the reviewer tells Rc for VRF is very low it may be "3 - 6" lb/ton
Assembly Calculator for Materials with Recycled Content
NC-2009 MRc4:Recycled Contentposted by Caroline PIN on
Dear all, I use the assembly calculator for a product made with wood and aluminium.
Defining Boundary for Energy Performance
NC-2009 EAp2:Minimum Energy Performanceposted by Ralph Bicknese on
For a renovation and addition to an existing college campus library, we are in the process of determining the boundary to use for energy performance. The existing building is 182,738 SF.