Option 2: Insulation for Baseline and Proposed

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Under "LEED Project Submittal Tips: Commercial Interiors 2009", the guide is referencing to Table G3.1-5(F) when applicable for baseline and propose values consistent with Appendix A.

5
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Aug 15, 2013, 1:17 pm

Enough for credit compliance

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  Mathilda Jonsson  on 

Hi all! My CS project is an office building.

5
Thu Aug 15, 2013, 5:55 am

How do we qualify for offsite salvaged materials?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Katherine Ann Resurreccion  on 

Hello! Our client, (the project owner) has a branch office from another country wherein there are bulk of furniture which were transported 3 years ago to our recently registered LEED project.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 15, 2013, 2:19 am

IEQc4 Compliance for Sustainably Sourced Materials

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

So the first AND in this credits as follows: Wall, ceiling and flooring systems and finishes, composite wood, agrifiber and fiberglass products, both exterior and interior adhesives, sealants, coa

3
Wed Aug 14, 2013, 11:00 pm
4
Wed Aug 14, 2013, 10:25 pm

Mixed use meter

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Alicia Villanueva  on 

We have a meter that measures: chiller + pump + lighting system. Since we are not discriminating by "end use": would this meter qualify towards this credit? Thanks GH

5
Senior Tax Accountant
Ernst & Young
LEEDuser Basic Member
4 thumbs up
Wed Aug 14, 2013, 9:31 pm

Shading Devices in Baselin - Option 2. Energy Model.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Im a bit confused whether to use overhangs or not in the baseline of the energy model for option 2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 14, 2013, 7:19 pm

Ventilation through adjoining room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  LEED Pro Consultant  on 

Hello, Our project is a residential building and will have no mechanical ventilation in the apartments. For this case, LEED asks us to comply with ASHRAE 62.1-2007 paragraph 5.1.

2
Wed Aug 14, 2013, 4:58 pm

LEED CI Fried chicken restaurant

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Jatuwat Varodompun  on 

I am working on a reastaurant project and have 3 questions 1 Do we need to provide Five types pd recycles as required by LEED or can we provide only the type of wastes generated by the building ty

3
Wed Aug 14, 2013, 4:10 pm

Site Characteristics Percentage

NC-2009 PIf2:Project Summary Details
posted by  Patrick Reale  on 

For some reason our building to site ratio percentage is extremely high (197%). The building 4 floors with a basement and a rooftop mechanical room. The total sf is 155545sf.

2
Wed Aug 14, 2013, 3:46 pm