Forum quick links
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
EAc1 Space Cooling and Heating
NC-2009 EAc1:Optimize Energy Performanceposted by Mark Rawson on
Hello, When I generate the EAc1 Summary Report in HAP I have a negative percent savings in space cooling and heating in the performance rating table.
Option 3 - strategy 2
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
MRpc102-Legal Wood
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kristopher Croghan on
So in doing some research, are the following certifications acceptable for the legal wood pilot credit?
Which rating system to use
CI-v4 INc2:LEED Accredited Professionalposted by Pamela Smith on
Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?
Option 1 Workforce Development Training
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Summer Minchew on
I have a project that has entered in to a Project Labor Agreement including the following: 1) Small, Local Disadvantaged Business Development Assistance, 2) First Source Employment Agreement (defin
Zero VOC
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Dionisio Franca on
Hello, The contractor is planning to use a moisture barrier product that has 0 (zero) VOC content. Is this acceptable for LEED for Schools 2009 or do we need a Small Scale Chamber test for it?
Proposed case outside airflow rates
NC-2009 EAp2:Minimum Energy Performanceposted by Cagril Comert on
Hi, Our office building is ventilated with a constant volume AHU and conditioned by VRF system. AHU supplies 100% fresh air to the spaces, while VRF system provides heating and cooling.
Major renovation of historic district bldg in historic district
posted by Pamela Smith on
Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.