Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Waste offsite

NC-2009 MRc2:Construction Waste Management
posted by  ethen mcmanus  on 

This credit focuses on how much waste material leaving the site is diverted from LANFILL.

1
Wed Jan 20, 2016, 2:37 pm

How to Apply Research Park Guidelines when Zoning is silent

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Maggie Hogan Skaug  on 

A project pursuing LEED CS 2009 is located in a research park and is subject to the research park's design guidelines. Per city zoning, there is no requirement for open space.

1
Thu Apr 7, 2016, 1:36 am

Waste rate

Homes-v2008 MRc3:Waste management
posted by  Gustavo De las Heras Izquierdo  on 

Credit MR 1.3 option "a" awards you points for generating 2.5 lbs/sf or less of net waste. However the table 1 Waste diversion gives you 0.5 points for generating 3 lbs/sf. Is this an errata?

1
Thu Jan 21, 2016, 10:26 pm

Looks like I’m first to post here so here goes!

Pilot-Credits EQpc85:Learning Controls for Thermal Comfort
posted by  Dirk Kestner  on 

1. Has anyone else pursued this Pilot? If so what was your experience? 2.

0

Maximum frontage without windows on primary facade

Pilot-Credits PC14:Walkable Streets
posted by  Margaret Montgomery  on 

The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met".

1
Fri Nov 4, 2016, 8:25 pm

Private Green Roof

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Luis Miguel Diazgranados  on 

Hi, I am working in a C&S LEED project and have doubts about vegetation that it expect to use for meet the 25 % of open space area.

1
Wed Apr 6, 2016, 9:21 pm
1
Wed Jan 27, 2016, 3:43 pm

Participate in LEEDuser Pilot Credit Forum

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Henry Mak  on 

Hi everyone, I have a silly question. For the evidence of participating in LEEDuser Pilot Credit Forum, what document could show this action?

1
Thu Jan 21, 2016, 2:46 pm

100% Tenant

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Emmanuel Pauwels  on 

We are working in a project that will have a single tenant occupying the whole building.

1
Thu Jan 21, 2016, 3:46 pm

Inconsistency between BD+C and O+M

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adam Stoker  on 

Despite efforts to better align the rating systems in LEED v4, there are some inconsistencies between the Enhanced Indoor Air Quality Strategies credits in BD+C and O+M.

0