Forum quick links
Pneumatic Controls - Monitoring Based Cx
CI-v4 EAc1:Enhanced commissioningposted by Christopher Lim on
I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.
About Spray adhesives, Material has voc g/l limit and Greenguard certificate.
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eunjoo Park on
My project is located in South Korea, so I open fall into difficulties to interpret manufacture data.
Spray adhesives has VOC Contents and GREENGURAD certificate also. This material can be use?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eunjoo Park on
My project located in South Korea. So I often fall into difficulties to interpretation manufacture data.
The material is "Scotch-WeldTM Hi-Strength Postforming 94 CA".
Timing outsourced solar plan on-site / the building
NC-2009 EAc2:On-Site Renewable Energyposted by Janine van den Kerkhof on
Hi All,
one product both meet two criteria in option2.
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on
Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.
Multi-occupant spaces required?
Retail-CI-v4 EQc6:Interior lightingposted by Jared Silliker on
I find the reference guide confusing on this credit. Am I reading it correctly that multi-occupant spaces do NOT need to be addressed for lighting controls within v4 Retail projects?
Kudos to this year's COTE Top Ten Winners!
posted by Nadav Malin on
Huge congratulations to everyone involved with a Top Ten winner this year!
In a rare feat--Leddy Maytum Stacy got two!
Humidification system
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
The energy consumption of humidification system has to be equal in baseline and Proposed building??
Is it considered process load??
Confirm: Tenant WE calc can include Base Building rainwater system
CI-v4 WEp1:Indoor water use reductionposted by Brian Salazar on
Hello! I have a CI project where the tenant occupies multiple contiguous floors.