Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED project that was certified as LEED Gold under LEED 2009 NC changes usage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Konstantina Kalliakoudi  on 

Hello to all,

I have following issue I have a LEED project that is certified as LEED Gold under LEED 2009 NC changes usage.

5
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Fri Jun 8, 2018, 2:52 pm

Option 2 HVAC Zoning & Controls

CI-v4 EAc2:Optimize energy performance
posted by  Aaron Wintersmith  on 

The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."

3
Default Avatar
Senior Energy Analyst
Capital Engineering Consultants
LEEDuser Basic Member
0 thumbs up
Fri Jun 8, 2018, 2:51 pm
17
Sustainability Director
Ayers Saint Gross
LEEDuser Basic Member
5 thumbs up
Fri Jun 8, 2018, 2:37 pm

Self-declared reports

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Charalampos Giannikopoulos  on 

Is there a template of self-declared report for compliance with Option 1? Has anyone ever specified a way of complying with requirements of Option 1? Thank you.

1
Mon Oct 15, 2018, 6:05 pm

Enhanced Commissioning LEED V4

CI-v4 EAc1:Enhanced commissioning
posted by  Michael Feyler  on 

Per the USGBC LEED V4 BD+C: New Construction Enhanced Commissioning website "The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the des

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Jun 7, 2018, 7:54 pm

Possible confusion over name

BITuser
posted by  Andrea Lemon  on 

Hi,

I imagine you've already considered this, but I wanted to mention it before you cross the point of no return...

1
Thu Jun 7, 2018, 7:40 pm

DuChateau Flooring loses FSC certification

Green Commons
posted by  Russell Perry  on 

This message came in earlier today and is something of which we should all be aware.  I took the extra step, in this world of uncertain facts, of checking the veracity of the message with Jaso

1
Thu Jun 7, 2018, 6:17 pm

Hotel mix use

NC-v4 EAp2:Minimum energy performance
posted by  jefferson thomas  on 

We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water? 

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 7, 2018, 3:36 pm

Future spaces for expansion vs date of certification

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Víctor Ramírez Orozco  on 

we are designing a school project with 14 classrooms and 5 more classrooms planned for future expansión of the school. Those 5 classrooms will not have anything but the walls, windows, and doors.

0

Exclusions from Regularly Occupied Spaces for Lab Spaces

CS-v4 EQc4:Daylight
posted by  Jordan Daniels  on 

I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).

1
Thu Jun 7, 2018, 1:23 pm