Forum quick links
LEED project that was certified as LEED Gold under LEED 2009 NC changes usage
posted by Konstantina Kalliakoudi on
Hello to all,
I have following issue I have a LEED project that is certified as LEED Gold under LEED 2009 NC changes usage.
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Self-declared reports
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Charalampos Giannikopoulos on
Is there a template of self-declared report for compliance with Option 1? Has anyone ever specified a way of complying with requirements of Option 1? Thank you.
Enhanced Commissioning LEED V4
CI-v4 EAc1:Enhanced commissioningposted by Michael Feyler on
Per the USGBC LEED V4 BD+C: New Construction Enhanced Commissioning website "The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the des
Possible confusion over name
posted by Andrea Lemon on
Hi,
I imagine you've already considered this, but I wanted to mention it before you cross the point of no return...
DuChateau Flooring loses FSC certification
posted by Russell Perry on
This message came in earlier today and is something of which we should all be aware. I took the extra step, in this world of uncertain facts, of checking the veracity of the message with Jaso
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
Future spaces for expansion vs date of certification
NC-v4 EAp1:Fundamental commissioning and verificationposted by Víctor Ramírez Orozco on
we are designing a school project with 14 classrooms and 5 more classrooms planned for future expansión of the school. Those 5 classrooms will not have anything but the walls, windows, and doors.
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).