Forum quick links
eQUEST pros/cons
posted by Douglas Flandro on
Can you comment on successful ways you have used eQUEST and pitfalls you have seen? We are considering training our architects to use it for early building analysis on all projects.
Data Center Minimum Requirement of 2%
NC-v4 EAp2:Minimum energy performanceposted by Amine Zeidane on
Hello,
Ventilation calculation square footage boundary
NC-2009 IEQp1:Minimum IAQ Performanceposted by Melissa Mikulka on
We have a project that contains a recycle bin storage area within a corridor. Do the exhaust calculations have to include the entire corridor space or can we designate an area around the
Recertification - Survey - How Often?
EBOM-v4 LTc1:Alternative transportationposted by Michelle Bracewell-Musson on
Hello,
Pre Fab Building Compliance
NC-v4 EQc2:Low emitting materialsposted by Kristen Magnuson on
Is it still possible to get 3 points for 5 compliant credit categories, if the building is entirely constructed off-site and then brought to the site and assembled?
LEED AP + Independent CxA
NC-v4 EAc1:Enhanced commissioningposted by Mike D on
If a team is appointed as LEED AP on a project, can they also act as the independent commissioning agent (the team has not design or construction contract)?
Baseline: existing heat pumps, new FCs
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I'm modeling a commercial building that has 7 conditioned floors and is heated and cooled by 3 electric heat pumps. According to TABLE G3.1.1A the baseline model should be a System 8.
Outdoor air
NC-v4 EAp2:Minimum energy performanceposted by Emmanuel Pauwels on
In exception C in section G3.1.2.6 Ventilation, it states that 'If the minimum outdoor air intake flow in the proposed design is provided in excess of the amount required by the rating authority or
Reapplying for credits
NC-2009 PIf2:Project Summary Detailsposted by jupiter luner on
We're getting ready to move onto construction phase.
Meeting Indoor Water Use Prerequisite for Fixtures and Fittings
Healthcare-v4 WEp2:Indoor water use reductionposted by Meike Borchers on
We have a project that is struggling to meet the prerequisite requirements of a 20% reduction from the LEEDv4 baseline as the fixtures and fittings are required to be minimum flow rates and flush v