Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Introduction

Green Commons
posted by  Jeff Geisinger  on 

Hi all, 

7
Wed Jun 27, 2018, 4:11 pm

Construction Phases

Hospitality-NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Larissa Murakami  on 

We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.

1
Fri Jun 29, 2018, 1:24 am

Can anyone share approach taken to comply with this or related Certified Multi-attribute Products and Materials?

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Panu Pasanen  on 

Hi, this looks pretty demanding spec, as the related "Certified Multi-attribute Products and Materials".

2
Wed Jun 27, 2018, 3:07 pm

Pilot credit - Building Material Human Hazard & Exposure Assessment

Retail-CI-v4 INc1:Innovation
posted by  Stacey Olson  on 

It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm.

Thanks,

0

Preliminary and Final Design Review Submission - Online Steps for Final Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stephen Sgro  on 

We received our preliminary design review report. All credits that were pending and ones requiring revisions have been revised and additional documents have been uploaded.

1
Wed Jun 27, 2018, 1:29 pm

CALGreen certification as alternate to Watersense?

CI-v4 WEp1:Indoor water use reduction
posted by  Paladino "Team"  on 

Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?

3
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Tue Jun 26, 2018, 7:17 pm

Concerns with FRP cladding

Green Commons
posted by  Vikram Sami  on 

We are looking into different building skin materials from including GFRC and FRP (amongst others) as alternatives to precast.

0

Establishment period for 50% landscape water use reduction

NC-2009 WEc1:Water Efficient Landscaping
posted by  Dimuth Kurukulaarachchi  on 

All mention of establishment periods refer to the no potable water/irrigation case (WEc1 Option 2), but what about for Option 1, 50% non-potable water use reduction?

0

Temperatures for Tab.6.8.1I

CS-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

According to Tab.6.8.1I for test procedure for VRF systems we have to consider AHRI 1230. I’m considering AHRI 1230 version “Approved by ANSI on 2 August 2010”.

3