Forum quick links
New Wood Invoices
NC-2009 MRc7:Certified Woodposted by Bobby White on
Hi everyone. I've been getting requests for invoices to be submitted along with the 'new wood' stating costs.
Diverse Uses Access
Schools-NC-v4 LTc4:Surrounding density and diverse usesposted by Lou Niles II on
Hello I'm looking for feedback from people with Rural projects OR projects in cities but in Unincorporated Areas in the United States, These areas often do not have sidewalks and I am wondering if
Storm Interval and Drawdown
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Leandro Silva on
Thank you for all of the information provided on this forum. I am confident in all of our calculations up to the Storm Interval and Drawdown calculations.
Phase Change Material deployable partitions?
posted by Alejandra Menchaca on
Have any of you heard of anyone ever using phase change material (PCM) "movable partitions" as a resiliency strategy to mitigate indoor overheating during a heat wave
Temporary modular building
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Isabelle Arnold on
Our project site includes an existing lab building as well as a modular building (essentially a large trailer) that is temporarily housing expansion of the lab until a new lab building is adde
Difference in VOC complaince/non-compliance depending on Regulation?
NC-v4 EQc2:Low emitting materialsposted by Renee Shirey on
New Wood vs Recycled Wood
NC-2009 MRc4:Recycled Contentposted by Bobby White on
Hi. Trying to understand this: Our company uses MDF in our products which claims 97% recycled content (all pre-consumer).
LEED HOMES only new Buidlings?
Homes-v4 IPc1:Integrative processposted by Daniel Busi on
Can you complete a LEED HOME on an already existing home or does it have to be new construction?
Third Party Source vs. Portfolio Manager
NC-v4 EAp3:Building-level energy meteringposted by Edgar Arevalo on
So according to the LEED Online template for Building-level Energy and Water Metering, it states to pick either "USGBC-approved data template", which is Portfolio Manager, OR "Third-party data sour
Airport Terminal Project Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Kaarina Nehring on
Hi all,