Forum quick links
LCA: Fly Ash percentage (Tally)
NC-v4 MRc1:Building life-cycle impact reductionposted by Mary Couch on
Hello,
Water analysis
NC-v4 WEc3:Cooling tower water useposted by Floyd Valade on
The documentation requirements for WEC3 requires the non-potable water analysis if using 100% non-potable (for 2 points).
Tenant Sales and/or Lease Agreement
CS-2009 WEp1:Water Use Reductionposted by Charalampos Giannikopoulos on
When selecting the option “Tenant Sales and/or Lease Agreement” it is required to provide the legally binding document (lease, sales agreement, tenant construction requirements, etc.) associated wi
I-Beam Audit for each AHU?
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Nelina Loiselle on
Simple question: Do we need to fill out an I-Beam audit form for each air handler? Or just the main four central fans for the building?
Company specific LEED instruction
posted by Bobby White on
At the risk of being in the wrong section for this question, does anyone on the list know of an entity that can give specialized LEED instruction?
Paints for Artwork
CI-v4 EQc2:Low emitting materialsposted by Felicity Lee on
Hi All,
I have a small office project where we are going to do wall artwork and to be painted by artists on-site.
MRc4 Calculator asks me for a password
NC-2009 MRc4:Recycled Contentposted by Monica Wilson on
Does anyone else experience this happening in their excel spreadsheet? I am able to download the 2009 calculator from the USGBC, and fill out info for MRc4.
Blower Door Test for Residential Units
NC-v4 EQp2:Environmental tobacco smoke controlposted by on
If a residential project has 4 floors of condos that allow smoking above 5 floors of apartments that do not allow smoking, does there need to be a blower door test performed for every unit, or just
Regularly occupied space that has high bay lighting fixtures but needs to comply with Strategy D
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
There is a garage space that acts as an auto service bay (regularly occupied space) but has a high ceiling installed with high bay lighting fixtures. After weighing all other options, no othe