Forum quick links
LEED in marketing campaigns
posted by Asil Rashid on
Hi all,
View type 1 & 2 with interior permanent obstructions
NC-v4 EQc8:Quality viewsposted by Khue Nguyen on
My project is an office building with workstation along continuous ribbon windows looking out to landscape. I understand that this work space is not qualified for View type 3.
green building - LEED
NC-v4 WEp1:Outdoor water use reductionposted by saeed kazemi on
hello every body.
Campus project certification fees
posted by Asil Rashid on
Hi all,
Case 2 Calculator Space Type
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Kevin Aisawa on
Hello,
percentage of energy type or overall
CI-v4 EAc3:Advanced energy meteringposted by Craig Flandermeyer on
The building in question has both electric and gas usage. The project is attempting to submeter the chillers to satisfy the tenant level requirement for advanced metering. It is estimat
PEFC Certification options
posted by Jeff Frost on
I am wanting to take the pulse of this group on behalf of a manufacturer who has asked us a similar question.
DOAS DCV Ventilation Requirements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kevin Aisawa on
Hello,
make up water for cooling tower
CI-v4 WEc1:Indoor water use reductionposted by Craig Flandermeyer on
Working on a Interiors project that has maximized efficiency in the flush and flow fixtures; proposing a rainwater harvesting tank to supplement/replace cooling tower make up water in order to gain
Ice Rink in Daylight Calculations?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Diana Smiciklas on
I'm currently working on an arena and aquatics complex, and I'm having trouble dictating if a lot of these spaces are included in the calculations as "regularly occupied spaces".