Forum quick links
Are you attending AIA Convention in June?
posted by Jerelyn Wilson on
BuildingGreen is considering hosting a reception and SDL Show & Tell at the AIA Conference on Architecture 2019.
University Housing
Schools-NC-v4 LTc5:Access to quality transitposted by Sean Adams on
We are doing a university housing project and have been basing it off of the BD+C New Construction but for this section if we are able to do it under School-NC we would be able to get the 4 points
Pilot Credit - Forum Participation
Pilot-Credits IPpc101:Integrative Processposted by Greg Romanczyk on
As part of the requirements for this pilot credit, we are noting our participation in the Forum. One of the questions listed asks about the number of meetings (i.e.
System 9 per floor according to ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
Pilot Credit MRpc87 - Verified Construction and Demolition Rates
NC-v4 MRc5:Construction and demolition waste managementposted by Tiffany Wilmot on
How does a C&D recycling facility get certified in order to attain the Pilot Credit MRpc87 (Verified Construction and Demolition Rates)?
CASE 3 - pedestrian-oriented hardscape area & 25% vegetated area
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Michal Marszalek on
Hi I have a question about this description: pedestrian-oriented hardscape areas can contribute to credit compliance.
Process Water Appliances not installed by owner, tenants not yet defined
NC-v4 WEp2:Indoor water use reductionposted by Ricardo Sá on
Hi,
Potable water use measurement - 1 meter or several meters?
NC-v4 WEp3:Building-level water meteringposted by Ricardo Sá on
Hi,
LEED4.1 Multi-attribute optimization - life cycle impact reductions in embodied carbon
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Dionisio Franca on
Quoted from the 4.1 Beta:
Tile and Stone Mortar
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Do I need to include the tile and stone mortar under this credit? What is the Product Type?