Forum quick links
Water meter installation location
EBOM-v4 WEp1:Indoor water use reductionposted by Shathiswara Rao on
The potential way to target water reduction is by monitoring the water use for flushing. Is it necessary to install a water meter for each piping that goes to separate toilets?
MRc1 Option 3
NC-v4 MRc1:Building life-cycle impact reductionposted by Barbara Clarke on
We have the calculations sf for our existing exterior enclosure and areas to be reused (excluding windows). How do we calculate the Exterior structure?
Call to Action: Getting votes for AIA Resolution on Climate Action at Business Meeting in Vegas
posted by Mary Ann Lazarus on
Dear SDL: Thanks to all who have already given their support to the AIA Resolution on Urgent and Sustained Climate Action. We're into the final push of getting out the vote to pa
Local utility using green power sources
NC-2009 EAc6:Green powerposted by Emily Purcell on
Curious if anyone has submitted this strategy, successfully or not, or has any other insight - I took over this project after construction documentation was finished so I'm not sure what the thinki
Renewable Energy Generation
ND-v4 GIBc11:Renewable energy productionposted by Jeff Forward on
This credit requires a certain percentage of renewable energy production capacity relative to annual cost.
Custom Furniture - Testing as assembly?
CI-v4 EQc2:Low emitting materialsposted by Linda Davisson on
We have a project with chairs that meet the emissions testing criteria and have custom upholstery that is GREENGUARD Gold. Do we include the upholstery as a unique line item on the LEM Calcul